Facility headroom, verified
Signed capacity for Garrison Halls A–C, the capital it lets wait, and the live feed behind both. Nothing below was changed on site: the study was read-only for 90 days.
Zone headroom at design condition
Signed Oct 18, 2026Live ingestion stream
simulated feed · 2 s cadenceCapital waiting on verified headroom
Open simulatorMethod status
4 / 4 steps completeTelemetry engine
The ingestion engine at demo.synapsethermal.com holds every raw point behind the signed table. It opens in its own tab with its own sign-in; the portal links into it by zone, point and time window.
Open by zone
links carry zone, point and window; the engine applies its own sign-inStudy, API and health
How to sign in
first open onlyOpen the engine from any link on this page
It opens in a new tab. The browser shows the engine's own sign-in prompt (HTTP Basic, realm "Synapse").
Enter the operator credentials issued with the study
Credentials come from Synapse Thermal with the facility's onboarding pack; the portal never asks for or stores them.
Later links open directly
The browser keeps the session, so zone and point links from the dashboard, certificates and the DRL module land on the right view without a second prompt.
Signed safe-kW table
One row per zone. Each names the element that binds first, so the fix can be priced against the upgrade it delays. Capacity counts as released only when both the electrical path and the cooling zone verify.
H is the verified headroom of each path at the design condition; M is the safety margin agreed with the operator. Whichever term is smaller names the limiting factor. Edit M(z) in the table to see the rule recompute; any edit voids the signature until the verifier re-signs.
Zone matrix
Signed · digest verifiedAudit view
CapEx deferral simulator
A verified table is worth most when it lets a purchase wait. The value of waiting is the present-value saving from paying later, set against the low-cost remediation that keeps the zone releasing kW in the meantime.
Savings tracker · deferral vs. tactical remediation
Values from the brief's illustrative case; r applies portfolio-wide800 V DC transition planner
The same release rule, evaluated per zone under three architectures. Projections come from the calibrated models; they narrow the range of outcomes but are not measurements.
Where heat is rejected
415 VAC · verifiedThermal / electrical flip analyzer
Limiting element per zoneHeadroom under scenario
Remediation roadmap · build in now
avoids post-lease retrofitDRL cooling forecasting & orchestration
Thermal coupling works the same way in air and in liquid: more IT load raises return-air or return-water temperature, which raises fan or pump demand on the same electrical path. The forecast shows that overhead before it lands. On direct-liquid zones the controller also works the ΔT–flow trade at the CDU, which is where the verified limit sits. The pilot is offered only on zones the study proved cooling-limited.
Tenant-side telemetry
What the controller minimizes
Cooling loop
Capacity effect
projection · re-verify before re-signingControl pilot
Shadow modePilot results · since activation
not activeFacility setup
Everything a study needs before day 0: the zones in scope, the telemetry that feeds them, the terms the table is signed under, and who may see or control what. The open items from the scoping call live here, with their answers.